• An agreement is signed with the endorsement of MTS for the rehabilitation and operation of the Desert Line.
• The remodeling of Tijuana Interchange Station and the Garcia Transloading Station reach their completion.
• The second and final phase of the new Garcia Transloading Station is being built.
• The Tecate Bridge is rehabilitated.
• 11 kilometers of the Short Line Tijuana-Tecate are rehabilitated.
• The PK8 spur is built.
• Five spurs and a perimeter fence are built at the Tijuana Station.